6920: Construction Design
- 6000: Management
Adoption Date: Sept. 4, 2012
Facilities will be designed to accommodate the educational and instructional needs of the district. The professional experience and judgment of staff will be used in developing such educational specifications. The law requires that special attention be given the accessibility to the education program by students of both sexes and those with disabilities. The superintendent will see that all construction projects comply with the requirements for accessibility to individuals with disabilities and comparability between the sexes.
After determining that a need for new or improved facilities exists, the superintendent, with the guidance of professional staff and subject to board approval, will engage in the following processes:
- Identify district staff as project managers;
- Select an architect;
- Review a site evaluation including an assessment of existing facilities, if any, on the site;
- Develop educational specifications recognizing instructional needs and available financial resources;
- Review and approve schematic design prepared by architect, assuring that the new or remodeled facility or part of a facility is readily accessible to and usable by individuals with disabilities;
- Review a value engineering study and constructability review, and approve construction design including construction estimates;
- Call for bids; and
- Review and approve final construction contract.
The district will comply with the terms and conditions as specified in the contract between the architect and the school district.
Legal References
Chapter 39.35 RCW | Energy conservation in design of public Facilities |
42 U.S.C. § 12101 et. seq. | Americans with Disabilities Act |
WAC 392-343-080 | Value engineering studies, constructability reviews, and building commissioning — Requirements and definitions |
WAC 392-343-102 | Construction management |
WAC 392-344-065 | Value engineering contracts |
WAC 392-344-066 | Constructability review contracts |
WAC 392-344-075 | Contracts — Filing |
Management Resources
- Policy News, October 2011 Policy Manual Revisions